Samar ApsaraINFRATECH
  1. Home
  2. Borewell & Groundwater

Pillar B Borewell & groundwater infrastructure

Borewell &
groundwater.

Tube wells drilled through overburden and rock, cased, gravel-packed, developed and yield-tested — Ø 5″ to 12″ bores, delivered to department and EPC specifications.

Truck-mounted DTH drilling rig with a compressor unit and casing pipes on a flat plot at sunrise.

Below the surface Scroll to descend

What happens
underground.

GLOVERBURDENCLAY / KANKARROCKAQUIFERWATER TABLEPILE GROUP

Surface Depth

Survey & mobilise

Ground level. Point layout from your BOQ or drawings, access, rig positioning and site safety set-up before a single metre is drilled.

  • Site survey
  • Mobilisation
  • Layout

Through the soil

ODEX drilling advances casing through pebbles, boulders and collapsible formations that stop a conventional bore.

  • ODEX method
  • Unconsolidated ground
  • Ø 5″ – 12″

Piles that carry load

Bored and micro-piling for buildings, plants and structures — 200 mm to 2000 mm diameter, reinforcement cages made to suit.

  • Micro / DTH / ODEX
  • Auger · DMC · Rotary
  • Cage making

Casing & lowering

MS ERW casing and slotted strainer pipe lowered to depth, welded, plumbed and capped to specification.

  • MS casing
  • Slotted screen
  • Steel fabrication

Into hard rock

DTH hammer and rotary drilling take the bore through rock — the depth where most contractors stop.

  • DTH hammer
  • DC / RC rotary
  • Deep bores

Water, proven

Gravel packing, compressor development and yield testing until the bore delivers clear, sand-free water — then pump and electrical installation.

  • Gravel pack
  • Compressor development
  • Yield test

Counter runs to 275 m — the drilling depth in one of our supplied work orders (Kanpur Dehat, U.P.). Schematic, not to scale.

Borewell / tube well Execution process

Seven steps.
One measured result.

Rig, casing and crew mobilised to the marked point. Access, water and safety barriers set up before drilling starts.

GL ±0.00AQUIFERPOINT / MOBILISEAIRYIELD · LPHPANELPUMP
A freshly drilled tube well being developed with compressed air: muddy water and sand blowing from the casing into a settling pit, with a compressor and water tanker behind.
DEVELOPCompressor development · illustrative
A yield test at a completed tube well: a discharge pipe running into a concrete measuring tank, with a diesel generator and control panel on a stand.
YIELD TESTPumping test · illustrative

Plant & equipment Rigs by method

Machines that
go deeper.

Three drilling methods, chosen to suit the ground. Illustrative imagery.

Truck-mounted ODEX drilling rig with its mast raised and a casing string advancing, with a stack of steel casing beside it.

ODEX Rig

Simultaneous drilling and casing advance for collapsing, boulder-bearing overburden.

Bore
5″ – 12″
Ground
Unconsolidated
Truck-mounted DTH drilling rig connected by an air hose to a large compressor truck at sunrise.

DTH Rig

Down-the-hole hammer with air compression for fast penetration in hard rock.

Bore
5″ – 12″
Ground
Rock
Crawler-mounted rotary piling rig with its mast raised, a drilling bucket and stacked steel casing.

Rotary Rig

Rotary drive with circulation for deep bores and large-diameter foundation drilling.

Depth
Up to 275 m in a supplied order
Method
DC / RC

Fabrication Steel work · Casing · Cage making · Liner rolling · Compressor development

Rigs by method

Project experience Case files

Work orders,
not adjectives.

Each case file is built from a real work order and records scope, method and status.

Case file 01Work order issued

Kanpur Dehat Tube Well Works

Hetvi Construction LLP · Uttar Pradesh

Construction of 10 bore / tube wells with deep drilling, casing, filter pack and development — the model for how we document every project.

Scope
10 bore / tube wells
Drilling
DC / RC up to 275 m
Casing
MSERW plain & slotted
Completion
Gravel pack · development · yield test
Case file 02Work order issued

PHED Alwar — 150 mm Tube Wells

PHED Rural Division 1st Alwar (NCR) · Rajasthan

Annual rate contract (NIT 27/2025-26, order dated 30 Mar 2026) for new 150 mm tube wells in Umrain and Malakhera sub-divisions.

Method
ODEX + DTH
Scope
Drill · case · pump · commission
Case file 03Work order issued

PHED Alwar — Tuleda Tube Well

PHED Rural Division 1st Alwar (NCR) · Rajasthan

125 mm single-phase tube well, village Tuleda, Umrain panchayat samiti (order dated 30 Jan 2025).

Bore
125 mm
Schedule
Feb – Apr 2025

All projects & case files

Enquiry BOQ · RFQ · Site requirement

Planning your next foundation or groundwater project?

Send the BOQ, drawings or a few lines on the site. We respond directly.

Upload / Share BOQ on WhatsApp

Share your requirement

This opens WhatsApp or your email app with your details pre-filled — nothing is stored on this website.